The challenge was to find a material that could stop the movement and the natural erosive nature of the sand. After rigorous environmental and performance analysis, Vital Bon-Matt Stonewall was applied to the exposed surface of the sand bund. The environmentally sound product provided a robust surface treatment that encapsulated over 95% of the total platform area of 300 hectares.
This project faced unique challenges from an erosion and sediment control perspective to stabilise 1.1 million cubic meters of sand
The challenge was to find a material that could stop the movement and the natural erosive nature of the sand. After rigorous environmental and performance analysis, Vital Bon-Matt Stonewall was applied to the exposed surface of the sand bund. The environmentally sound product provided a robust surface treatment that encapsulated over 95% of the total platform area of 300 hectares.
By adopting environmental best practice philosophies and delivering immediate stabilisation, Vital Bon-Matt Stonewall provided clear sustainability deliverables.
ENVIRONMENT | INNOVATION | SUSTAINABLE PROCUREMENT | WATER | LEGACY
Get in touch with us for a full copy of the Case Study.
Vital Chemical is committed to the continuous improvement of our business functions to ensure the delivery of best value products and services, whilst contributing toward objectives and outcomes aligning with The United Nations Social Development Goals (UNSDGs). Our Australian made products listed on the Infrastructure Sustainability Council (IS Council) ISupply Directory can support your project’s IS Council accreditation submission across a range of qualifying categories.